Gravity Edge
Inaugural asset under Gravity Edge. 36MVA of secured grid power, irrevocable planning permissions, and an investment-grade anchor tenant on long-dated lease. Brownfield refurbishment and capacity expansion from 8MW to 22MW underway.

LDN1, Camberley
Overview
Inaugural data centre asset under Gravity Edge.
LDN1 is the inaugural data centre asset under Gravity Edge, acquired and operated by Digital Gravity Partners as the platform's deal execution and asset management arm.
The site is operating today at 8MW with an irrevocable expansion path to 22MW. 36MVA of grid power is secured under long-term capacity rights. The anchor lease is in place with a Tier-1 financial institution on a long-dated, investment-grade contract.
LDN1 anchors a wider London build-out targeting more than 100MW of capacity across the M25 corridor and surrounding metros.
Asset facts
- Status
- Operating
- Vehicle
- Gravity Edge
- Location
- Camberley, United Kingdom
- Operating capacity
- 8MW operating
- Planned capacity
- Expanding to 22MW
- Secured grid power
- 36MVA
- Anchor tenant
- Tier-1 financial institution
- DGP role
- Investor & Operator
Capacity build-out
8MW today. 22MW underway.
Operating: 8MW under live customer load.
Planned: expansion to 22MW through staged brownfield refurbishment and M&E upgrade. Fit-out runs in parallel with anchor occupancy under controlled construction protocols.
Secured power: 36MVA grid capacity locked in via long-term capacity rights, removing the connection-window risk that affects new-build projects in the UK market.
Business plan
Anchor-led lease-up, operational discipline, staged capex.
Anchor-led lease-up. The investment-grade anchor underwrites the operating base; remaining floor is leased through DGP's direct enterprise and wholesale relationships.
Operational discipline. PUE targets are managed through M&E modernisation and live-load optimisation. SLAs are committed at investment-grade levels with defined penalties and remediation.
Capital deployment. Staged refurbishment capex is matched to lease-up milestones, with downside protection from the anchor commitment and contracted cashflow.
Location
Camberley, on the London M3 corridor.
Camberley sits c.30 miles south-west of central London on the M3 corridor, with direct fibre routes into Slough, Reading and the FLAP-D interconnection points.
The site benefits from low latency to the City of London while sitting outside the most power-constrained postcodes inside the M25, enabling the 36MVA capacity grant.